燃氣電廠決策系統 待辦清單與定義缺口追蹤
Gas Power Plant Decision System — To-Do List & Definition-Gap Tracker
這個頁面不是開發 gantt,而是把目前 operating model 還沒被正式定義、還沒被驗證、或還沒被產品化的工作拆成可追蹤項目。每個項目都可直接切換狀態,方便你用來做討論與對焦。
This is not a Gantt chart. It breaks down everything in the operating model that has not yet been formally defined, validated, or productionised into trackable items. Each item lets you flip its status inline — ideal for discussion and alignment.
狀態儲存在目前瀏覽器本地端;如果換裝置或清除瀏覽資料,狀態會回到預設值。
Status is stored locally in this browser; switching devices or clearing browsing data resets it to defaults.